Skip to main content

Kian Overseas

Freight · Customs · Storage

PLOTTING ROUTE[000%]
Kian OverseasImport · Export · Logistics
Technology

Protecting a product launch with a sea-air solution

A delayed production run threatened a hard launch date. A sea-air routing recovered the timeline at a fraction of full-air cost.

Cargo being loaded onto a freighter aircraft on the apron at an airport terminal.
Air gateway · Cargo apron
Challenge

The problem to solve.

01

Production slipped, leaving too little time for ocean freight but too much volume for an economical full-air move.

The launch date was fixed and publicised — failure was not an option.

Solution

How we solved it.

02

We engineered a sea-air routing via a transhipment hub, recovering most of the lost time at well below full-air cost.

Customs was pre-cleared on data so the goods released on arrival and flowed straight to distribution.

Illustrative outcome

On time
Launch date protected
−61%
Vs. full-air freight cost
0
Customs holds

Illustrative scenario — a representative example of the type of work we do, not a specific, named-client result.

They found a route we didn’t know existed and saved the launch. That’s the difference between a vendor and a partner.

[CLIENT NAME]

Supply Chain Manager, [TECH CLIENT]

Get started

Have a challenge like this?

Tell us your supply-chain challenge. We'll come back with a clear plan and an all-in cost.