Protecting a product launch with a sea-air solution
A delayed production run threatened a hard launch date. A sea-air routing recovered the timeline at a fraction of full-air cost.

The problem to solve.
Production slipped, leaving too little time for ocean freight but too much volume for an economical full-air move.
The launch date was fixed and publicised — failure was not an option.
How we solved it.
We engineered a sea-air routing via a transhipment hub, recovering most of the lost time at well below full-air cost.
Customs was pre-cleared on data so the goods released on arrival and flowed straight to distribution.
Illustrative outcome
- On time
- Launch date protected
- −61%
- Vs. full-air freight cost
- 0
- Customs holds
Illustrative scenario — a representative example of the type of work we do, not a specific, named-client result.
“They found a route we didn’t know existed and saved the launch. That’s the difference between a vendor and a partner.”
Have a challenge like this?
Tell us your supply-chain challenge. We'll come back with a clear plan and an all-in cost.